GENERAL CHARGES |
|
|
|
Meter Installation
Charges |
|
DESCRIPTION
|
AMOUNT
| |
In cases where consumer opts to supply his own meter |
|
Single Phase Meter |
Rs. 50/- Per meter |
|
Three Phase Metrer |
Rs. 100/- Per meter | |
Three Phase Meter (With CTs and PTs)
|
2% of the cost of the Meter/Metering equipment subject to a minimum of Rs.
300/-.
| |
Meter inspection and testing if the correctness of a meter is challenged by the
consumer:
| |
Single Phase |
Rs. 25/- | |
Poly Phase whole current i.e without C.T. |
Rs. 50/- | |
LT meter with CTs |
Rs. 250/- | |
H.T. & E.H.T. Metering equipment |
Rs. 500/- |
|
Note: If the challenged meter is found to be incorrect, the credit
of these charges will be given to the consumer these will be
forfeited. |
|
|
|
Meter Changing/Changing the Position of a Meter |
|
DESCRIPTION
|
AMOUNT
| |
Single Phase |
Rs. 50/- | |
Poly Phase whole current i.e without C.T. |
Rs. 100/- | |
LT meter with CTs |
Rs. 500/- | |
H.T. & E.H.T. Metering equipment |
Rs. 1000/- | |
|
|
|
Fuse Replacement |
|
DESCRIPTION
|
AMOUNT
| |
Replacement of Consumer's Fuse(s) |
Rs.5/-
| |
|
|
|
Meter Re-sealing Charges |
|
DESCRIPTION
|
AMOUNT
|
|
Meter cup board |
Rs. 20/- | |
Cut out
where it exists independently sealed |
Rs. 15/- | |
Meter
cover or Meter Terminal cover (Single Phase) |
Rs. 60/- | |
Meter
cover or meter terminal cover (Poly Phase) |
Rs. 150/- | |
Maximum
Demand Indicator or CTs chamber |
Rs. 350/- | |
Potential fuses |
Rs. 350/- | |
|
|
|
Reconnection Charges |
|
DESCRIPTION
|
AMOUNT
| |
Domestic Supply/Village Chaupal |
Rs. 50/- | |
Non-domestic Supply |
Rs.100/-
| |
AP
Supply |
Rs. 60/- | |
LT
Industrial Supply (upto 20 KW) |
Rs. 250/- | |
LT
Industrial Supply (above 20 KW and upto 50 KW) |
Rs. 500/- | |
HT
Supply (above 50 KW) |
Rs. 1000/- | |
Bulk
Supply/Street lighting |
Rs. 500/- | |
|
|
|
Testing Consumer's Installation |
|
DESCRIPTION
|
AMOUNT
| |
The installation is found to be not defective and if wiring contractor or his
representative is present at the time of testing: |
|
Single Phase Meter |
Nil
| |
Three Phase Meter |
Nil
| |
The installation is found to be defective/The Wiring Contractor or his
representative fails to be present: |
|
Single Phase Meter |
Rs. 50/- for each subsequent visit |
|
Three Phase Meter |
Rs. 100/- for each subsequent visit |
|
|
|
|
|
| |
|
|
|
Meter Reading Cards |
|
DESCRIPTION
|
AMOUNT
| |
Provision of Meter Reading Cards (including PVC Jacket) |
Rs. 5/- | |
Replacement of Meter Cards |
Rs. 2/- per
card |
|
|
|
|
Replacement of Glass |
|
DESCRIPTION
|
AMOUNT
| |
Replacement of broken glass of the Meter Cupboard |
Rs. 10/- | |
Replacement of broken glass (Single Phase Meter) |
Rs. 50/- | |
Replacement of broken glass (For Three Phase Meter) |
Rs. 100/- | |
|
|
|
Supply of Duplicate Copies of Board's Bills |
|
DESCRIPTION
|
AMOUNT
| |
Domestic Consumers/Village Chaupals |
Rs. 1/- | |
Non-domestic Consumer |
Rs. 2/- | |
LT Industrial (upto 20 KW)/AP Consumers |
Rs. 2/- | |
LT Industrial (20 KW-50 KW)/Street Lighting Consumers |
Rs. 4/- | |
HT Supply/Bulk Supply Consumers |
Rs. 10/- | |
|
|
|
Revised Board's Bills |
|
(if the accuracy of bill is challenged by the consumer & a review is demanded) |
|
DESCRIPTION
|
AMOUNT
| |
Domestic/Village Chaupals/Non-domestic Consumers |
Rs. 2/- | |
Agricultural & Industrial Consumers |
Rs. 10/- | |
|
Note: If the bill is found to be incorrect, the credit of fee will be given to
the consumer, otherwise it will be forfeited. |
|
|
|
Application Processing Charges |
|
S. No. Connected Load
|
Application Processing Fee
|
|
1
Upto 2 KW
|
Rs10/-
|
|
2
Above 2 KW
|
Rs. 25/- per KW or part thereof subject to the maximum of Rs. 10,000
|
|
|
|
|
Consumption Security |
|
Sr. No.
|
Category of Consumer
|
Consumption Security Amount (RS. /KW or part thereof of the connected Load)
|
|
1.
|
Agriculture Supply
|
100
|
|
2.
|
Domestic Supply
|
500
|
|
3.
|
LT Industrial Supply
|
500
|
|
4.
|
HT Industrial Supply
|
750
|
|
5.
|
Non Domestic Supply
|
1000
|
|
6.
|
Bulk Supply
|
1000
|
|
7.
|
MITC
|
750
|
|
8.
|
Lift Irrigation
|
1000
|
|
9.
|
Public Water Works
|
1500
|
|
10.
|
Street Light
|
2000
|
|
11.
|
Railways
|
1500
|
|
|
|
|
|
|
|
|
|