***Sales Circular & Instructions 2007 UHBVN***
SALES CIRCULAR NO. SUBJECT SALES INSTRUCTION NO. SUBJECT
U-93-2007 Voluntary Disclosure Scheme for AP tubewell connections and Domestic and Non-domestic supply consumers in the Nigam U-50/2007 Inspection of Distribution Transformers by XENs(OP) at the time of energisation
U-92-2007 HERC Regulations on Standards of Performance of Distribution Licensee. U-49/2007 Special campaign for Disconnection of defaulting consumers during the month of November 2007.
U-91-2007 Incentive for public for recovery of defaulting amount on PDCOs. U-48/2007

Self certification scheme for consumers electrical installation upto 20 KW in all categories of consumers.

U-90-2007 Release of connections in urban slums/un-authorised colonies and areas . U-47/2007 Temporary Empanelment of M/s Ramanuj Industries, Delhi for the purchase of LT CTs and 11 KV CTs to be supplied by the consumers
U-89-2007 Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas. U-46/2007

HERC Regulation on duty to supply electricity on request- self execution of work.

U-88-2007 Surcharge Waiver Scheme for Domestic Consumers in Urban Areas.

U-45/2007

Temporary Empanelment of firm’s for purchase of 3 phase 4 wire LT-CT Operated Static energy meters.

U-87-2007

Release of permanent electric connection to the area developed by various colonizers/developers in Haryana.

U-44/2007 Temporary Empanelment of firms for purchase of 3 phase, 4 wire Whole current LT Static energy meter of rating 10-60 Amps with MCB
U-86-2007 Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas. U-43/2007 Temporary Empanelment of firm’s for purchase of 3 phase 4 wire LT Static energy meters (with impulse counter) of rating 10-40 A with MCB.
U-85-2007

Guidelines for setting the disputed court cases in Lok Adalat.

U-42/2007

HERC Regulation on duty to supply electricity on request- self-execution of work.

U-84-2007 Provision of Electronics LT-CT Meter on New Connection. U-41/2007 Temporary Empanelment of M/s Riken Instrumentation Ltd. Panchkula for purchase of Three Phase 4-wire HT (11KV) CT/PT Operated Static Trivector Energy Meter
U-83-2007

Release of power connections to tubewells under AP category.

U-40/2007 Temporary Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers
U-82-2007

Release of power connections to the tubewell through individual/ dedicated transformer.

U-39/2007 Temporary Empanelment of firm’s for purchase of 3 phase 4 wire LT-CT Operated Static energy meters.
U-81-2007

Use of CFL on New Electrical connections.

U-38/2007 Temporary Empanelment of firms for purchase of 3 phase, 4 wire Whole current LT Static energy meter of rating 10-60 Amps with MCB
U-80-2007 Room in each circle for maintaining the consumer files. U-37/2007 Temporary Empanelment of firm’s for purchase of 3 phase 4 wire LT Static energy meters (with impulse counter) of rating 10-40 A with MCB.
U-79-2007

Schedule of Electricity Duty- Sales Circular No.4/2001.

U-36/2007 Temporary Empanelment of firm’s for purchase of Single-Phase LT Static energy meters (with electromagnetic counter) of rating 5-20 A/10-40 A with MCB.
U-78-2007

Revival of applications of tubewell connections.

U-35/2007 Temporary Empanelment of firms for purchase of 3 phase, 4 wire Whole current LT Static energy meter of rating 10-60 Amps with MCB.
U-77-2007 Clarification regarding overhauling the account of Industrial Consumers where Electronic Meters are installed. U-34/2007

Temporary empanelment of firms for the purchase of 33 KV CTs/PTs for purchase by the consumer.

U-76-2007

Providing metering on Distribution Transformers – Energy Audit thereof.

U-33/2007

Temporary Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers.

U-75-2007 Tapping of electric supply for release of connections.

U-32/2007

Temporary Empanelment of firm’s for purchase of 3 phase 4 wire LT-CT Operated Static energy meters.
U-74-2007

Voluntary Disclosure Scheme for AP tubewell connections in the Nigam.

U-31/2007

Temporary Empanelment of firms for purchase of 3 phase, 4 wire Whole current LT Static energy meter of rating 10-60 Amps with MCB.
U-73-2007

Conversion of Horticulture tubewell connections into Agriculture Power Category.

U-30/2007

Temporary Empanelment of firm’s for purchase of Single-Phase LT Static energy meters (with electromagnetic counter) of rating 5-20 A/10-40 A with MCB.

U-72-2007

Release of connection in urban slums/un authorised colonies and areas.

U-29/2007

Temporary Empanelment of firm’s for purchase of 3 phase 4 wire LT Static energy meters (with impulse counter) of rating 10-40 A with MCB.

U-71-2007

Provisional Billing of Agriculture Metered consumers in case of meter gets defective/burnt/faulty.

U-29/2007

Temporary Empanelment of firm’s for purchase of 3 phase 4 wire LT Static energy meters (with impulse counter) of rating 10-40 A with MCB.

U-70-2007 Responsibility for the parameter of Line-Losses, Damage Rate of distribution transformers, Rate of return on Assessment & Realization, defaulting amount & RIB.

U-28/2007

Release of connection to flat owners of Group Housing Societies/ Multi-storey buildings

U-69-2007

Revised rate of electricity tariff for Registered Gaushalas.

U-27/2007

Definition of industrial feeder.

U-68-2007 Levy of fuel surcharge adjustment (FSA) on power consumers in UHBVN.

U-26/2007

Use of Distribution Transformer by HT industrial applicants.
U-67-2007 Revised rate of electricity tariff for Horticulture and Fisheries.

U-25/2007

Use of Distribution Transformer by HT industrial applicants.
U-66-2007 Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas

U-24/2007

Shifting of NDS/industrial connection due to sealing by HUDA/other Govt. agencies.
U-65-2007

Implementation of Bi-Monthly Billing for Domestic & Non-Domestic Consumers.

U-23/2007

Installation of Earth Leakage circuit Breakers (ELCB).
U-64-2007

Release of industrial connections.

U-22/2007

Conversion of existing LT AP tubewell connections to HT configuration at Nigam’s cost.

U-63-2007 Recoveries from private consumer defaulters

U-21/2007

Release of industrial connections.
U-62-2007 Surcharge Waiver Scheme for Domestic Consumers in Urban Areas. U-20/2007

Temporary Empanelment of firm’s for purchase of LT-CT Operated Static energy meters through consumers.

Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas. U-19/2007 Boosting of Revenue from Sale of Power.
Instructions for dealing the cases of unauthorised use of Electricity under Electricity Act-2003, Electricity (Amendment) Act, 2003 and Electricity (Amendment) Act, 2007. U-18/2007 Temporary Empanelment of M/s Riken Instrumentation Ltd. Panchkula for purchase of Three Phase 4-wire HT (11KV) CT/PT Operated Static Trivector Energy Meter.
Implementation of Decentralized billing at Circle Level, Monthly Billing and Revised Bill Format. U-17/2007

Temporary Empanelment of firms for purchase of 3 phase, 4 wire Whole current LT Static energy meter of rating 10-60 Amps with MCB.

Use of CFLs on New Electrical Connections

U-16/2007

Charging of Domestic Supply Tariff to Youth Hostels run by sports department.
RGGVY Scheme - Strengthening of Panchayati Raj Institutions - Devolution of powers to Panchayats to manage electricity operations in villages – Panchayats as Franchisees.

U-15/2007

Temporary Empanelment of firm’s for purchase of LT-CT Operated Static energy meters.
Use of CFLs by Tentwalas. U-14/2007

Temporary empanelment of firms for the purchase of 33 KV CTs/PTs for purchase by the consumer.

Use of CFLs on the existing connections of industrial/commercial consumers.

U-13/2007

Energisation of distribution transformer and 11 KV lines installed for release of AP tubewell connections and water supply connections.

Instructions for dealing the cases of theft of Electricity under Electricity Act-2003, Electricity (Amendment) Act, 2003 and Electricity (Amendment) Act, 2007.

U-12A/2007 Testing of 3-phase meters in M&T Lab which are received in Nigam’s store till 20.02.07 against P.O’s placed by CE/MM.

Release of connection in unauthorized colonies- levy of development charges.

U-12/2007

Grant of more than one connection in the same premises.

Release of connection in unauthorized colonies- levy of development charges.

U-11/2007 Temporary Empanelment of firm for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers.

Applicability of tariff for supply to tubewell within Municipal Limits.

U-10/2007 Temporary Empanelment of firm’s for purchase of Single-Phase LT Static energy meters (with electromagnetic counter) of rating 5-20 A/10-40 A with MCB.

Revival of applications of tubewell connection who have deposited Rs.20,000/- consent money.

U-9/2007

Temporary Empanelment of firms for purchase of 3 phase, 4 wire Whole current LT Static energy meter of rating 10-60 Amps with MCB.

Fixing of responsibility for by passing the MCCB of DTs.

U-8/2007 Recording of Meter Reading.

Norms for site checking by Vigilance Wing.

U-7/2007

Self certification scheme for consumers electrical installation upto 20 KW in all categories of consumers.

Hiring of Nigam’s poles for laying cable TV Network and internet wires by small cable operator and telecom operator.

U-6/2007 Temporary Empanelment of firm’s for purchase of Single-Phase LT Static energy meters (with electromagnetic counter) of rating 5-20 A/10-40 A with MCB.

Interest on staff security, meter security and consumption security deposit for the year 2007-08.

U-5/2007 Temporary Empanelment of firms for the purchase of LT CTs, 11 KV CTs and 11 KV PTs to be supplied by the consumers.

Use of CFLs on New Electrical Connections.

U-4/2007

Temporary Empanelment of firms for purchase of 3 phase, 4 wire Whole current LT Static energy meter of rating 10-60 Amps with MCB.

Incentive for Nambardars of villages for recovery of defaulting amount on PDCOs.

U-3/2007 Temporary Empanelment of firm’s for purchase of 3 phase 4 wire LT Static energy meters (with impulse counter) of rating 10-40 A with MCB.

Mode of payment of bills by consumer.

U-2/2007

To install LT-CT Trivector meters on Distribution Transformers.

Proper fixing arrangement through thimble and lugs for the meter shifted outside the premises of the consumers.

U-1/2007

Temporary Empanelment of firm’s for purchase of 3 phase 4 wire LT-CT Operated Static energy meters.

Disconnection of supply in default of payment.

   

Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas.

   

Clarification in respect of Sales Circular No. U-3/2005 dated 18.01.2005 Instructions for dealing with the cases of Unauthorized Use of Electricity.

   

Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas-

   

Implementation of short term Open Access within the State of Haryana and distribution and other related charges to be recovered from Open Access customers- Clarification.

   

Levy of peak load exemption charges for power supplied during peak load hours to HT industrial consumers.

   

Segregation of industrial loads from mixed urban and mixed rural feeders.

   

Shifting of meter of DS/NDS category outside the premises of the consumers.

   

Implementation of short term Open Access within the State of Haryana and distribution and other related charges to be recovered from Open Access customers.

Applicability of tariff for supply to tubewells within Municipal Limits.

Charging of Domestic Tariff instead of Non-domestic tariff to elementary schools.

   

Constitution of Special Court under Section-153 of the Electricity Act-2003.

   
Guidelines for setting the disputed court cases in Lok Adalat.    
Applicability of tariff for supply to tubewells within Municipal Limits    

Settlement scheme of Pending Electricity Bills of Rural Domestic and Agriculture category consumers.

   

Levy of fuel surcharge adjustment on power consumers in UHBVN- clarification thereof.

   

Loss prevention incentive Scheme.

   

Spot Billing of HT Industrial and LT Industrial Consumer.

   

Settlement of Pending Electricity Bills of Defaulter Govt. Schools of Rural Areas.

   

To analyze defective/burnt HT CT-PT meters, LT-CT meters, LT Industrial meters above 20 KW, DS & NDS meters above 20 KW.

   

Release of permanent electric connection to the area developed by various colonizers/developers in Haryana.

   

Hiring of Nigam’s poles for laying cable TV network by Small cable operators.

   

Hiring of Nigam’s poles for laying of internet wires.

   

Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas- 26th Clarification.

   

Release of connection to Govt. Schools in rural areas.

   

Conversion of feeding source from rural to urban mode.

   
U-15/2007

Improving Nigam services in rural areas Village Managers, Entrusting of duties and responsibilities thereof.

   
U-14/2007 Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 26th Clarification.    

U-13/2007

Installation of meters on poles outside the consumer premises.    

Reducing the period of full amount deposit in AP connections.

   

Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in Rural Areas- 25th  Clarification.

   

Essential feeder scheme.

   

Conversion of feeding source from rural to urban mode.

   

Promotion of Solar Water Heating System in domestic sector by providing rebate on electricity bills to the users of Solar Water Heaters.

   

Release of connection to Flat owners of Group Housing Societies/ multistory buildings.

   

Billing of Domestic and Non-domestic consumers during the period when the meters remain defective/dead stop/burnt /faulty or inoperative/premises locked.

   

Hiring of Nigam Poles by Small Cable TV Operators.

   

Release of power connection to tubewell under AP category.

   

Construction of industrial feeder for group of industries having load of 500 KW or above.

   

Extension in time limit of demand notice of industrial applicants

   

Loading of Distribution transformers.