Energy conservation
Payment options
Tariff & charges
Download forms
Right to information
Employee corner
haryana.gov.in
Public Meetings
Online Web-Based MIS
***Sales Circular & Instructions 2012 UHBVN***
SALES CIRCULAR NO.SUBJECTSALES INSTRUCTION NO.SUBJECT
U-01/2012 Policy in respect of Essential Feeders. U-01/2012 Payment of cumulative bills in respect of BPL connections.
U-02/2012 Special campaign for providing on the spot regular connection in Rural Areas for Domestic and non-domestic supply category U-02/2012 Checking of readings of DS/NDS/SP Connections in Urban Area
U-03/2012 Construction of independent feeder for single or a group of consumers (for 11KV level). U-03/2012 Self Declaration of connected load by the urban consumers of Domestic/Non Domestic Category
U-04/2012 Interest on staff security, meter security and consumption security deposit for the year 2012-13.
U-05/2012 C.M. Announcements. U-05/2012 Release of Public Water Works connections
U-06/2012 Schedule of tariff for supply of energy. U-06/2012 Provision of terminal cover plates/seals on meters
U-07/2012 Schedule of tariff for supply of energy- Corrigendum. U-07/2012 Safety measures to minimize accidents
U-08/2012 Providing of LT-CT operated Static Energy Meters U-08/2012 Reduction in DT damage rate
U-09/2012 Levy of peak load exemption charges for power during peak load hours. U-09/2012 Release of pending industrial/seasonal industries connections
U-10/2012 Connecting Electrified Dhanies to the Rural Domestic Feeder. U-10/2012 Reduction of line losses
U-11/2012 Release of Tubewell Connection under modified scheme U-11/2012 Disconnection of permanent defaulters
U-12/2012 HERC regulations on duty to supply electricity on request- Self execution of works in respect of AP tubewell connections. U-12/2012 Dismantlement of idle lines.
U-13/2012 Policy for recovery of defaulting amount in respect of Govt. Employees. U-13/2012 Non-release of industrial connections due to inadequate capacity at feeding sub-stations- Amendment of instructions.
U-14/2012 Cost of replacement of defective / burnt meters. U-14/2012 No power cut feeder
U-15/2012 Open Access Regulation – 2012 U-15/2012 Shifting/ Release of Industrial/NDS load from RDS/AP feeders to urban/ mixed urban/ Industrial feeder.
U-16/2012 HERC regulations on duty to supply electricity on request- Self execution of works in respect of AP tubewell connections. U-16/2012 Issue of Meters
U-17/2012 Release of tube-well connection under modified scheme U-17/2012 Billing of consumers during the period when the meter remains defective/ dead stop/ burnt /faulty or inoperative/ premises locked
U-18/2012 Levy of fuel surcharge adjustment (FSA) on power consumers in UHBVN. U-18/2012 Shifting/Release of Industrial/NDS load from RDS/AP feeders to urban/ mixed urban/ Industrial feeder.
U-19/2012 Billing of consumer connected on Independent feeders U-19/2012 Release of Pending industrial connection in UHBVN
U-20/2012 Replacement of Distribution T/F installed under Self Financing /HVDS in case of theft. U-20/2012 No power cut feeder.
U-21/2012 Collection charges @ 5% plus service tax on the municipal tax levied on the electricity consumers within the limit of Municipality U-21/2012 Release of Pending industrial connection in UHBVN.
U-22/2012 Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas. U-22/2012 Release of Pending industrial connection in UHBVN.
U-23/2012 Cost of replacement of defective/burnt meters. U-23/2012 Power Regulatory measures on RDS feeders
U-24/2012 Conversion of feeding source from Rural to Urban mode U-24/2012 Extension of load for DS consumers.
U-25/2012 Furnishing information to detect theft of electricity – Institution of award/Loss Prevention Incentive Scheme. U-25/2012 Clarification regarding Service Connection Charges applicable as per HERC Order for Independent Feeder.
U-26/2012 Release of tube-well connection under modified scheme Instruction Contravention of provisions of the Electricity Act 2003/Rules and Regulations made thereunder and Directions/Orders issued by the Commission.
U-27/2012 HERC Regulations No. HERC/12/2005 on “Power to Require Security” under Section-47 of the Electricity Act-2003- Revision of Consumption Security of Existing Consumers.
U-28/2012 Voluntary Scheme for declaration of un-authorized load VDS- 2012.
U-29/2012 Schedule of Tariff for supply for electricity by UHBVNL and DHBVNL for FY 2012-13.
U-30/2012 Assessment of connected load and checking of connected load of Domestic supply consumers for any unauthorized extension of load for the purpose of levy of penalty.
U-31/2012 Furnishing information to detect theft of electricity – Institution of award/Loss Prevention Incentive Scheme.
U-32/2012 Policy in respect of Essential Feeders.
U-33/2012 Voluntary Scheme for declaration of un-authorized load VDS- 2012.
U-34/2012 Levy of fuel surcharge adjustment (FSA) on power consumers in UHBVN.
U-35/2012 Connecting Electrified Dhanis to the Rural Domestic Feeder..
U-36/2012 Furnishing information to detect theft of electricity – Institution of award/Loss Prevention Incentive Scheme.
U-37/2012 Voluntary Scheme for declaration of un-authorized load VDS- 2012.
U-38/2012 Release of connections on 11 KV/ 33 KV level.
U-39/2012 Scheme for Out of Court Settlement of pending Court Cases/Arbitration Cases.
U-40/2012 Shifting of LT/HT line.
U-41/2012 Furnishing information to detect theft of electricity – Institution of award/Loss Prevention Incentive Scheme.
U-41-A/2012 Levy of fuel surcharge adjustment (FSA) on power consumers in UHBVN
U-42/2012 Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas.
U-43/2012 Redressal of public grievances regarding billing disputes.
U-44/2012 Settlement of the Pending Electricity Bills of Rural Domestic and Agriculture categories of consumer in rural areas. (Amended Sales Circular U-42/2012)
U-45/2012 Guidelines for electrification system in the colonies/multi-storey buildings developed by Colonizers Licensee/SEZ- Amendment.